07
Aug

Backyard Office: Plumbing

Posted by John Keatley / Filed under Backyard Office

This was probably the least exciting day so far.  No offense to our wonderful plumber.  He did a great job and is super nice, but there is just not as much visual gratification when it comes to laying down water and sewer pipes.  Next up is the concrete foundation and floor, so maybe that will feel more like a party.

Previous post in this series: Backyard Office: Ground Breaking
Next post in this series: Backyard Office: Concrete Forms

 

Comments

As a full time plumber I will grant you it is not as gratifying as seeing the footings poured. Gratification in plumbing comes when that first flush goes down and stays down.

posted by mike Murrow on 08.07.11 at 9:50 pm

[...] Previous post in this series: Backyard Office: Shed Demo & Building Next post in this series: Backyard Office: Plumbing [...]

John,
Thanks for these posts, I am enjoying them. This is an exciting project and I look forward to seeing the finished space. I hope to do the same type of thing myself one day.
Regards
Brian

posted by Brian Carey on 08.08.11 at 7:45 am

Your going to have a toilet & sink in this space? Nice. You’ll never have to leave!

posted by Neckbeard on 08.08.11 at 12:32 pm

[...] Previous post in this series: Backyard Office: Plumbing [...]

Leave a comment